Former Blackwood Wire Products









Project Former Blackwood Wire Products Factory
Location Port Talbot
Located on Acacia Avenue in Port Talbot, Stationary House was formerly an industrial unit used by Blackwood Wire Products, a manufacturer of fencing and wire products. Following a period of vacancy, the site was earmarked for redevelopment into a new satellite dialysis unit, as part of an going investment in regional healthcare facilities.
Safe Demolition and Dismantling Services Ltd were appointed as the demolition contractor for the project working in partnership with a returning client, responsible for the safe and controlled partial demolition of the existing industrial structure to make way for the new medical facility.
Scope of Work:
- Soft-strip of the office buildings attached the industrial unit
- Non-Licensed Asbestos removal
- Asbestos cement sheet removal
- Demolition of office block
- Partial demolition of the industrial unit
- Site clearance of demolition arisings
- Concrete cutting to enable drainage installations
- Floor grinding to remove industrial floor coatings
This project demonstrates our capability in managing complex demolition works within urban and sensitive settings, helping to repurpose redundant industrial premises into spaces that benefit the local community.